A full Costa del Sol renovation connects layout, kitchens, bathrooms, services and finishes. Create a coherent home for year-round living or seasonal stays, with coordinated decisions and handover.
Design reference
The complete project comes first.
When several rooms need to change, define the whole before selecting individual finishes. Full renovation connects circulation, room use and technical work within one scope. The proposal should distinguish retained elements, new work and decisions requiring design or specialist assessment.
What to define in a full renovation
Layout, circulation and use of each room.
Kitchens, bathrooms and contracted building services.
Floors, joinery, storage and lighting.
Materials, equipment, supplies and exclusions.
Sequencing, approvals and handover conditions.
What needs assessment
Changes to walls, services, structure or permitted use need assessment. External work, specialist equipment and design services are not assumed included unless specified in the proposal.
Kitchens and bathrooms have distinct requirements. Home offices, garages and wellness spaces can form part of a project after assessing the property and intended equipment.
01
Kitchen renovation on the Costa del Sol
A kitchen for cooking, entertaining and moving naturally towards the terrace. Layout, worktops, storage and services respond to daily use, coastal light and the conditions of your Costa del Sol property.
Dimensions, existing services, power requirements, ventilation and appliance compatibility need confirmation. Appliances and wall changes are included only when specified.
02
Bathroom renovation on the Costa del Sol
Calm, comfortable bathrooms with carefully resolved details. Renovation brings showers, lighting and materials together with assessed waterproofing, ventilation and drainage for your coastal home.
A level-access shower, relocated sanitaryware or wall changes cannot be confirmed from photographs. Equipment, protection and material installation should be specified.
03
Home office renovation on the Costa del Sol
A home office on the Costa del Sol should support focused work without taking over the home. Screen light, privacy, cooling, connectivity and storage belong within one considered room.
Confirm included furniture, equipment and technical work. Acoustic treatment should respond to the actual space.
04
Private garage renovation on the Costa del Sol
A private garage can share the architectural language of your villa. Floors, light, wall finishes and EV charging are considered alongside ventilation, moisture and circulation to create a setting worthy of your cars.
Converting a garage into living accommodation is not assumed permitted. Use, access, ventilation, moisture and technical requirements need their own assessment.
05
Home gyms and wellness spaces on the Costa del Sol
A private gym or spa built around your routine. For a Costa del Sol home, training, relaxation and materials are coordinated with floor loads, ventilation and moisture conditions.
Interfaces with specialist equipment and services.
Saunas, steam rooms and spa equipment depend on specialists, manufacturer requirements and assessment of water, power, moisture and loads. They are not assumed part of a general renovation.
House or apartment?
Property type also matters: houses connect floors and areas; apartments bring services, building management and access considerations.
Materials suited to the setting, clear decisions wherever you are, and handover planned around enjoying your home.
01
Material selection
How are selections compared and approved?
Compare samples in the actual coastal light and confirm suitability for exposure, moisture and intended maintenance. For terraces or wet areas, have the specialist verify use classification and slip performance.
Record product, finish, installation and approval before ordering. If an alternative is proposed, confirm its effect on appearance, cost and supply before accepting it.
What can be followed without being at the property?
If you live abroad, agree access, a project contact, meetings and a decision record. Visual updates and written approvals track scope, supplies and changes; decisive samples are reviewed before ordering.
Separate what can be reviewed through photographs or meetings from decisions requiring samples, measurement or a visit. Remote updates do not replace on-site technical checks.
03
Project handover
What should be checked before the work is signed off?
Before your arrival, review contracted work, equipment tests and agreed cleaning. Handover brings together keys or access, instructions, documentation and a snagging list with named responsibilities and dates.
Record checks, owners and agreed dates. Confirm operating and maintenance documents, applicable warranty conditions and how questions after handover will be handled.
What to decide before requesting a proposal.
Does full renovation mean replacing everything?+
No. Scope should distinguish what stays, what is restored and what is replaced. A whole-home intervention can retain suitable materials and features.
Can I request just a kitchen or bathroom?+
You can enquire about an individual room. Even partial work requires services, access and connections to retained areas to be assessed.
One annual programme for a home that is cared for throughout the year. From air conditioning and pool care to fresh linen before you arrive, Aurea Homes coordinates your property’s everyday needs in Málaga, Marbella, Estepona and Nerja.